ITAC Assessment: BD0097
ITAC logo
ITAC Assessment: BD0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fuses and Fuse Components
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 25,000
ft2
Annual Production 38,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,613 1,109,320
kWh
Electricity Demand $37,865 3,249
kW-mo/yr
Electricity Fees $4,056 -
Natural Gas $7,798 1,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $588,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $545,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $2,363 $700 - - $2,363
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $996 $300 $445
13,775
kWh
$551
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $993 - $993
31,067
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $854 $450 $854
26,671
kWh
- - - - -
05 3.4151: Minimize water usage $792 $1,240 - - - - - $792
-
Tgal
06 3.5316: Contract a wood pallet recycling company $600 $300 - - - - $600 -
07 4.452: Eliminate shift $291,200 $120,000 - - - $291,200 - -
08 4.452: Eliminate shift $249,600 $120,000 - - - $249,600 - -
09 4.452: Eliminate shift $41,600 $40,000 - - - $41,600 - -
TOTAL RECOMMENDED $588,998 $282,990 $2,292
71,513
kWh
$551
-
kW-mo/yr
$2,363
-
MMBtu
$582,400 $600 $792
-
Tgal
TOTAL IMPLEMENTED $545,409 $242,690 $854
26,671
kWh
- $2,363
-
MMBtu
$540,800 $600 $792
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs