Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Dried Lumber and wooden moldings
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 435,600
ft2
Annual Production 500,000
thousand feet
Production Hrs. Annual 2,805
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,532 2,852,828
kWh
Electricity Demand $57,909 805
kW-mo/yr
Natural Gas $4,816 743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $319 - $186
5,184
kWh
$133
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,732 $5,494 $3,325
53,386
kWh
$1,407
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $3,330 $30 $2,350
38,170
kWh
$980
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $435 $250 $307
5,022
kWh
$128
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,898 $60 $1,339
21,682
kWh
$559
-
kW-mo/yr
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,433 $360 $6,631
107,238
kWh
$2,802
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,085 $3,000 $5,708
92,588
kWh
$2,377
-
kW-mo/yr
-
08 2.2414: Use waste heat from hot flue gases to preheat $8,365 $1,755 - - $8,365
09 2.2511: Insulate bare equipment $378 $873 - - $378
TOTAL RECOMMENDED $36,975 $11,822 $19,846
323,270
kWh
$8,386
-
kW-mo/yr
$8,743
TOTAL IMPLEMENTED $25,280 $10,037 $17,496
285,100
kWh
$7,406
-
kW-mo/yr
$378
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs