ITAC Assessment: WV0234
ITAC logo
ITAC Assessment: WV0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rubber and Plastic Mixer Machines
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 304,000
ft2
Annual Production 180
pieces
Production Hrs. Annual 2,384
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,039 1,864,800
kWh
Natural Gas $131,418 13,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,079 $800 $2,079
26,224
kWh
- - -
02 2.2628: Utilize a less expensive cooling method $9,910 $4,200 $9,910
125,697
kWh
- - -
03 2.2515: Use optimum thickness insulation $6,520 $2,125 - $6,520
-
MMBtu
- -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,825 $660 $3,825
51,861
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $1,903 $4,076 - $1,903
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $1,512 $2,020 - $1,512
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,201 $22 $1,201
15,236
kWh
- - -
08 2.7111: Reduce illumination to minimum necessary levels $8,732 $1,650 $8,732
110,637
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $712 $758 - $712
-
MMBtu
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,260 $1,342 - - $1,260
-
gal
-
11 4.521: Clear and rent existing space $7,300 $1,160 - - - $7,300
12 4.521: Clear and rent existing space $50,000 $1,500 - - - $50,000
TOTAL RECOMMENDED $94,954 $20,313 $25,747
329,655
kWh
$10,647
-
MMBtu
$1,260
-
gal
$57,300
TOTAL IMPLEMENTED $33,047 $8,492 $25,747
329,655
kWh
- - $7,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs