ITAC Assessment: WV0186
ITAC logo
ITAC Assessment: WV0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Gaseous Hydrogen
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $1
M
to 5
M
# of Employees 1
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,290 1,046,600
kWh
Electricity Fees $2,663 -
Natural Gas $172,297 147,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $730 $472 - $730
-
MMBtu
- - -
02 2.6218: Turn off equipment when not in use $5,510 - $5,510
104,924
kWh
- - - -
03 2.2511: Insulate bare equipment $100 $138 - $100
-
MMBtu
- - -
04 2.2522: Isolate hot or cold equipment $655 $1,580 - $655
-
MMBtu
- - -
05 2.2437: Recover waste heat from equipment $200 $470 - $200
-
MMBtu
- - -
06 2.7111: Reduce illumination to minimum necessary levels $1,834 $1,000 $1,834
34,877
kWh
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $385 $45 $385
7,327
kWh
- - - -
08 2.2437: Recover waste heat from equipment $47,250 $400,000 $47,250
899,766
kWh
- - - -
09 3.4155: Meter waste water $25,656 - - - $25,656
-
Tgal
- -
10 3.5311: Recover and reuse waste material $5,755 $5,000 - - - $5,755
-
gal
-
11 4.821: Pay bills on time to avoid late fees $371 - - - - - $371
TOTAL RECOMMENDED $88,446 $408,705 $54,979
1,046,894
kWh
$1,685
-
MMBtu
$25,656
-
Tgal
$5,755
-
gal
$371
TOTAL IMPLEMENTED $32,752 $655 $5,895
112,251
kWh
$830
-
MMBtu
$25,656
-
Tgal
- $371
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs