Assessment Year | 2000 |
---|---|
Principal Product | Gaseous Hydrogen |
NAICS |
n/a
|
SIC | 2813: Industrial Gases |
Sales Range | $1 M to 5M |
# of Employees | 1 |
Plant Area |
20,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,290 | 1,046,600 |
kWh
|
$0.050 |
Electricity Fees | $2,663 | - |
|
- |
Natural Gas | $172,297 | 147,291 |
MMBtu
|
$1.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,752 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $730 | $472 | - |
$730
-
MMBtu
|
- | - | - | |
02 | 2.6218: Turn off equipment when not in use | $5,510 | - |
$5,510
104,924
kWh
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $100 | $138 | - |
$100
-
MMBtu
|
- | - | - | |
04 | 2.2522: Isolate hot or cold equipment | $655 | $1,580 | - |
$655
-
MMBtu
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $200 | $470 | - |
$200
-
MMBtu
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,834 | $1,000 |
$1,834
34,877
kWh
|
- | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $385 | $45 |
$385
7,327
kWh
|
- | - | - | - | |
08 | 2.2437: Recover waste heat from equipment | $47,250 | $400,000 |
$47,250
899,766
kWh
|
- | - | - | - | |
09 | 3.4155: Meter waste water | $25,656 | - | - | - |
$25,656
-
Tgal
|
- | - | |
10 | 3.5311: Recover and reuse waste material | $5,755 | $5,000 | - | - | - |
$5,755
-
gal
|
- | |
11 | 4.821: Pay bills on time to avoid late fees | $371 | - | - | - | - | - | $371 | |
TOTAL RECOMMENDED | $88,446 | $408,705 |
$54,979
1,046,894
kWh
|
$1,685
-
MMBtu
|
$25,656
-
Tgal
|
$5,755
-
gal
|
$371 | ||
TOTAL IMPLEMENTED | $32,752 | $655 |
$5,895
112,251
kWh
|
$830
-
MMBtu
|
$25,656
-
Tgal
|
- | $371 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs