ITAC Assessment: WV0182
ITAC logo
ITAC Assessment: WV0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Processed Vegetables
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 410
Plant Area 80,000
ft2
Annual Production 89,000,000
lb
Production Hrs. Annual 6,916
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,199 6,756,155
kWh
Natural Gas $8,627 1,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $253,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,539 $60 $5,539
108,441
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,677 $175 $1,677
32,825
kWh
- -
03 2.2628: Utilize a less expensive cooling method $5,450 $1,870 $5,450
106,682
kWh
- -
04 2.2621: Modify refrigeration system to operate at a lower pressure $1,200 $70 $1,200
23,447
kWh
- -
05 2.7144: Install spectral reflectors / delamp $1,009 $1,458 $1,009
19,637
kWh
- -
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $35,688 $6,000 $35,688
698,710
kWh
- -
07 2.2624: Use cold waste water to cool chiller feed water $7,785 $12,000 $7,785
152,403
kWh
- -
08 3.3122: Use filtration, centrifuging to remove contaminants $56,000 $69,950 - $56,000
-
lb
-
09 3.6126: Direct waste gasses to boiler combustion air $119,000 $250,000 - $119,000
-
lb
-
10 4.652: Replace existing equipment with more suitable substitutes $20,000 $7,000 - - $20,000
TOTAL RECOMMENDED $253,348 $348,583 $58,348
1,142,145
kWh
$175,000
-
lb
$20,000
TOTAL IMPLEMENTED $29,425 $8,763 $9,425
184,350
kWh
- $20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs