Assessment Year | 1999 |
---|---|
Principal Product | Tractor Trailer Brake Cam |
NAICS |
n/a
|
SIC | 3625: Relays and Industrial Controls |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
42,500
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 3,504
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,496 | 2,644,783 |
kWh
|
$0.037 |
Electricity Demand | $69,623 | 13,762 |
kW-mo/yr
|
$5.06 |
Electricity Fees | $39 | - |
|
- |
Natural Gas | $4,663 | 530 |
MMBtu
|
$8.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $127,789 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,856 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $1,188 | $867 |
$1,188
32,239
kWh
|
- | - | - | - | - | |
02 | 2.6218: Turn off equipment when not in use | $30 | - |
$30
879
kWh
|
- | - | - | - | - | |
03 | 2.7144: Install spectral reflectors / delamp | $87 | $423 |
$87
2,345
kWh
|
- | - | - | - | - | |
04 | 2.2515: Use optimum thickness insulation | $2,992 | $1,125 |
$2,992
81,184
kWh
|
- | - | - | - | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $39,780 | $3,000 | - |
$39,780
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,447 | $27 |
$1,447
39,273
kWh
|
- | - | - | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $71,180 | $39,000 |
$46,763
1,269,050
kWh
|
$51,480
-
kW-mo/yr
|
$(-27,063.0)
-
MMBtu
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $370 | $90 |
$370
9,965
kWh
|
- | - | - | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $550 | $201 |
$550
14,947
kWh
|
- | - | - | - | - | |
10 | 3.5316: Contract a wood pallet recycling company | $750 | $250 | - | - | - | - |
$750
-
lb
|
- | |
11 | 3.3131: Use evaporation to concentrate material | $1,107 | $50 | - | - | - |
$1,107
-
Tgal
|
- | - | |
12 | 4.444: Install system to collect scrap | $8,308 | $500 | - | - | - | - | - | $8,308 | |
TOTAL RECOMMENDED | $127,789 | $45,533 |
$53,427
1,449,882
kWh
|
$91,260
-
kW-mo/yr
|
$(-27,063.0)
-
MMBtu
|
$1,107
-
Tgal
|
$750
-
lb
|
$8,308 | ||
TOTAL IMPLEMENTED | $49,856 | $4,568 |
$1,768
48,065
kWh
|
$39,780
-
kW-mo/yr
|
- | - | - | $8,308 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs