Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Tractor Trailer Brake Cam
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 42,500
ft2
Annual Production 0
units
Production Hrs. Annual 3,504
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,496 2,644,783
kWh
Electricity Demand $69,623 13,762
kW-mo/yr
Electricity Fees $39 -
Natural Gas $4,663 530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,856

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $1,188 $867 $1,188
32,239
kWh
- - - - -
02 2.6218: Turn off equipment when not in use $30 - $30
879
kWh
- - - - -
03 2.7144: Install spectral reflectors / delamp $87 $423 $87
2,345
kWh
- - - - -
04 2.2515: Use optimum thickness insulation $2,992 $1,125 $2,992
81,184
kWh
- - - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,780 $3,000 - $39,780
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,447 $27 $1,447
39,273
kWh
- - - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $71,180 $39,000 $46,763
1,269,050
kWh
$51,480
-
kW-mo/yr
$(-27,063.0)
-
MMBtu
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $370 $90 $370
9,965
kWh
- - - - -
09 2.4221: Install compressor air intakes in coolest locations $550 $201 $550
14,947
kWh
- - - - -
10 3.5316: Contract a wood pallet recycling company $750 $250 - - - - $750
-
lb
-
11 3.3131: Use evaporation to concentrate material $1,107 $50 - - - $1,107
-
Tgal
- -
12 4.444: Install system to collect scrap $8,308 $500 - - - - - $8,308
TOTAL RECOMMENDED $127,789 $45,533 $53,427
1,449,882
kWh
$91,260
-
kW-mo/yr
$(-27,063.0)
-
MMBtu
$1,107
-
Tgal
$750
-
lb
$8,308
TOTAL IMPLEMENTED $49,856 $4,568 $1,768
48,065
kWh
$39,780
-
kW-mo/yr
- - - $8,308
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings