ITAC Assessment: WV0178
ITAC logo
ITAC Assessment: WV0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Flat Glass
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 600,000
ft2
Annual Production 240,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,595,019 77,982,709
kWh
Electricity Demand $1,031,792 174,306
kW-mo/yr
Electricity Fees $18,649 -
Natural Gas $7,550,551 2,361,101
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $844,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $192,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.2691: Shut off cooling if cold outside air will cool process $23,912 - $23,912
698,710
kWh
- - - -
02 2.6218: Turn off equipment when not in use $2,919 $165 $2,919
85,287
kWh
- - - -
03 2.7122: Disconnect ballasts $16,730 - $16,730
488,863
kWh
- - - -
04 2.4314: Use synthetic lubricant $2,758 $550 $2,758
80,598
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $431 $105 $431
12,603
kWh
- - - -
06 2.2511: Insulate bare equipment $7,766 $2,000 - $7,766
-
MMBtu
- - -
07 2.2437: Recover waste heat from equipment $5,726 $870 - $5,726
-
MMBtu
- - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,578 $1,000 - $1,578
-
MMBtu
- - -
09 2.2414: Use waste heat from hot flue gases to preheat $5,104 $1,315 - $5,104
-
MMBtu
- - -
10 2.8113: Purchase gas directly from a contract gas supplier $164,498 - - - - - $164,498
11 3.5212: Regrind, reuse, or sell scrap plastic parts $184 - - - - $184
-
lb
-
12 3.5316: Contract a wood pallet recycling company $1,200 $100 - - $1,200
-
lb
- -
13 4.441: Install automatic packing equipment $611,520 - - - - - $611,520
TOTAL RECOMMENDED $844,326 $6,105 $46,750
1,366,061
kWh
$20,174
-
MMBtu
$1,200
-
lb
$184
-
lb
$776,018
TOTAL IMPLEMENTED $192,097 $2,165 $19,649
574,150
kWh
$7,766
-
MMBtu
- $184
-
lb
$164,498
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs