Assessment Year | 2016 |
---|---|
Principal Product | Metal Band Saw Blades |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3425: Saw Blades and Handsaws |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
60,000
ft2
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,287 | 470,240 |
kWh
|
$0.096 |
Electricity Demand | $7,606 | 1,900 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $4,672 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,511 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,511 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,411 | $8,838 |
$2,896
30,065
kWh
|
$373
-
kW-mo/yr
|
$142 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $632 | $100 |
$504
5,234
kWh
|
$102
-
kW-mo/yr
|
$26 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $328 | $719 |
$252
2,621
kWh
|
$62
-
kW-mo/yr
|
$14 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $140 | $34 |
$134
1,387
kWh
|
- | $6 | |
TOTAL RECOMMENDED | $4,511 | $9,691 |
$3,786
39,307
kWh
|
$537
-
kW-mo/yr
|
$188 | ||
TOTAL IMPLEMENTED | $4,511 | $9,691 |
$3,786
39,307
kWh
|
$537
-
kW-mo/yr
|
$188 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs