ITAC Assessment: WV0174
ITAC logo
ITAC Assessment: WV0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Handblown glass
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 137
Plant Area 80,000
ft2
Annual Production 260,000
pieces
Production Hrs. Annual 4,896
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,672 616,647
kWh
Natural Gas $509,601 166,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $356,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $231,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $210 $200 $210
4,103
kWh
- - - -
02 2.7135: Install occupancy sensors $161 $125 $161
3,224
kWh
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $685 $1,090 $685
13,775
kWh
- - - -
04 2.1113: Reduce combustion air flow to optimum $229,919 $1,000 - $229,919
-
MMBtu
- - -
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $9,278 $2,760 - $9,278
-
MMBtu
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $69,389 $17,840 - $69,389
-
MMBtu
- - -
07 2.6218: Turn off equipment when not in use $1,338 - - $1,338
-
MMBtu
- - -
08 2.1224: Replace boiler $1,371 $9,000 - $1,371
-
MMBtu
- - -
09 3.5212: Regrind, reuse, or sell scrap plastic parts $60 - - - - $60
-
lb
-
10 3.5248: Separate and recycle scrap metal to foundry or for sale $1,900 $100 - - $1,900
-
lb
- -
11 4.423: Move product using mechanical means $42,323 $8,219 - - - - $42,323
TOTAL RECOMMENDED $356,634 $40,334 $1,056
21,102
kWh
$311,295
-
MMBtu
$1,900
-
lb
$60
-
lb
$42,323
TOTAL IMPLEMENTED $231,527 $1,200 $210
4,103
kWh
$231,257
-
MMBtu
- $60
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs