Assessment Year | 1998 |
---|---|
Principal Product | Rubber, plastic, bulk goods |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
100,000
ft2
|
Annual Production | 585
ton
|
Production Hrs. Annual | 1,920
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $255,751 | 3,633,353 |
kWh
|
$0.070 |
Electricity Demand | $120,836 | 13,942 |
kW-mo/yr
|
$8.67 |
Natural Gas | $385,291 | 132,601 |
MMBtu
|
$2.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $205,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $1,075 | $2,580 |
$1,075
28,722
kWh
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $16,667 | $9,432 | - |
$16,667
-
MMBtu
|
- | - | |
03 | 2.2511: Insulate bare equipment | $4,282 | $5,130 | - |
$4,282
-
MMBtu
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $322 | $482 | - |
$322
-
MMBtu
|
- | - | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $162 | $550 | - |
$162
-
MMBtu
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $142 | $220 |
$142
3,810
kWh
|
- | - | - | |
07 | 3.4115: Recover and reuse cooling water | $670 | $1,525 | - | - |
$670
-
Tgal
|
- | |
08 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,940 | $550 | - | - |
$1,940
-
Tgal
|
- | |
09 | 4.521: Clear and rent existing space | $180,000 | $4,000 | - | - | - | $180,000 | |
TOTAL RECOMMENDED | $205,260 | $24,469 |
$1,217
32,532
kWh
|
$21,433
-
MMBtu
|
$2,610
-
Tgal
|
$180,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs