ITAC Assessment: WV0145
ITAC logo
ITAC Assessment: WV0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ceiling tile
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 276,000
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $943,860 14,043,670
kWh
Electricity Demand $408,310 27,963
kW-mo/yr
Natural Gas $965,647 229,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,184,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,801 $1,250 $2,801
73,271
kWh
- - - - - - -
02 2.2511: Insulate bare equipment $4,143 $734 - $4,143
-
MMBtu
- - - - - -
03 2.1113: Reduce combustion air flow to optimum $2,936 $1,000 - $2,936
-
MMBtu
- - - - - -
04 2.7241: Install outside air damper / economizer on hvac unit $595 $1,440 - $595
-
MMBtu
- - - - - -
05 2.4221: Install compressor air intakes in coolest locations $1,410 $340 $1,410
36,928
kWh
- - - - - - -
06 2.2414: Use waste heat from hot flue gases to preheat $9,068 $3,700 - $9,068
-
MMBtu
- - - - - -
07 2.6218: Turn off equipment when not in use $516 - $516
13,482
kWh
- - - - - - -
08 2.2437: Recover waste heat from equipment $2,635 $7,710 - $2,635
-
MMBtu
- - - - - -
09 2.4133: Use most efficient type of electric motors $5,762 $11,820 $5,762
150,645
kWh
- - - - - - -
10 2.7122: Disconnect ballasts $3,120 $1,530 $3,120
81,770
kWh
- - - - - - -
11 2.4314: Use synthetic lubricant $1,076 $500 $1,076
28,136
kWh
- - - - - - -
12 2.1331: Burn a less expensive grade of fuel $13,250 $12,000 - - $13,250
-
MMBtu
- - - - -
13 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $543,058 $2,440,200 $543,058
9,766,413
kWh
- - - - - - -
14 2.2437: Recover waste heat from equipment $2,349 $1,365 - $2,349
-
MMBtu
- - - - - -
15 2.2511: Insulate bare equipment $2,343 $833 - $2,343
-
MMBtu
- - - - - -
16 2.2511: Insulate bare equipment $527 $160 - $527
-
MMBtu
- - - - - -
17 2.1114: Limit and control secondary combustion air in furnace $1,559 $570 - $1,559
-
MMBtu
- - - - - -
18 2.8114: Change rate schedules or other changes in utility service $162,751 - - - - - - - - $162,751
19 3.6193: Install equipment (eg compactor) to reduce disposal costs $92,886 $11,000 - - - - - $92,886
-
lb
- -
20 3.5212: Regrind, reuse, or sell scrap plastic parts $122 - - - - - - - $122
-
lb
-
21 3.2123: Convert to high volume low pressure (hvlp) paint guns $18,689 $16,000 - - - - $18,689
-
gal
- - -
22 3.4115: Recover and reuse cooling water $12,280 $6,200 - - - $12,280
-
Tgal
- - - -
23 4.441: Install automatic packing equipment $301,000 $71,000 - - - - - - - $301,000
TOTAL RECOMMENDED $1,184,876 $2,589,352 $557,743
10,150,645
kWh
$26,155
-
MMBtu
$13,250
-
MMBtu
$12,280
-
Tgal
$18,689
-
gal
$92,886
-
lb
$122
-
lb
$463,751
TOTAL IMPLEMENTED $134,283 $44,827 $12,759
333,822
kWh
$9,949
-
MMBtu
- - $18,689
-
gal
$92,886
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs