Assessment Year | 1998 |
---|---|
Principal Product | Technical and Signal glassware |
NAICS |
n/a
|
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
175,000
ft2
|
Annual Production | 1,800,000
ton
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,914 | 2,120,164 |
kWh
|
$0.038 |
Electricity Demand | $92,823 | 5,009 |
kW-mo/yr
|
$18.53 |
Electricity Fees | $(-6,553.0) | - |
|
- |
Natural Gas | $504,764 | 123,217 |
MMBtu
|
$4.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $111,373 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,017 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $276 | $281 |
$276
7,913
kWh
|
- | - | - | - | - | |
02 | 2.6218: Turn off equipment when not in use | $2,672 | - |
$2,672
76,202
kWh
|
- | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $77 | $82 |
$77
5,569
kWh
|
- | - | - | - | - | |
04 | 2.2514: Cover open tanks | $6,458 | $522 | - | - |
$6,458
-
MMBtu
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,010 | $2,720 |
$162
4,689
kWh
|
$848
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $572 | $266 | - | - |
$572
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $221 | $199 | - | - |
$221
-
MMBtu
|
- | - | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $340 | - | - | - |
$340
-
MMBtu
|
- | - | - | |
09 | 2.7122: Disconnect ballasts | $1,037 | $1,770 |
$1,037
14,947
kWh
|
- | - | - | - | - | |
10 | 2.8113: Purchase gas directly from a contract gas supplier | $78,270 | - | - | - | - | - | - | $78,270 | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $440 | - | - | - | - | - |
$440
-
lb
|
- | |
12 | 3.5316: Contract a wood pallet recycling company | $400 | $63 | - | - | - | - |
$400
-
lb
|
- | |
13 | 3.4111: Use closed cycle process to minimize waste water production | $9,975 | $8,755 | - | - | - |
$9,975
-
gal
|
- | - | |
14 | 4.441: Install automatic packing equipment | $9,625 | $2,125 | - | - | - | - | - | $9,625 | |
TOTAL RECOMMENDED | $111,373 | $16,783 |
$4,224
109,320
kWh
|
$848
-
kW-mo/yr
|
$7,591
-
MMBtu
|
$9,975
-
gal
|
$840
-
lb
|
$87,895 | ||
TOTAL IMPLEMENTED | $85,017 | $5,100 |
$4,147
103,751
kWh
|
$848
-
kW-mo/yr
|
$912
-
MMBtu
|
- |
$840
-
lb
|
$78,270 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs