ITAC Assessment: WV0140
ITAC logo
ITAC Assessment: WV0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Stamped lead Plates
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 50,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,321 4,883,060
kWh
Natural Gas $12,822 1,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,346 $1,000 - $3,346
-
MMBtu
- - - -
02 2.4133: Use most efficient type of electric motors $6,131 $10,800 $6,131
126,319
kWh
- - - - -
03 2.1331: Burn a less expensive grade of fuel $2,650 $2,400 - - $2,650
-
MMBtu
- - -
04 2.4314: Use synthetic lubricant $498 $342 $498
10,258
kWh
- - - - -
05 2.1213: Direct warmest air to combustion intake $1,671 $1,420 - $1,671
-
MMBtu
- - - -
06 2.2437: Recover waste heat from equipment $10,274 $470 - $10,274
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,125 $383 $1,125
23,154
kWh
- - - - -
08 3.5142: Treat and reuse equipment cleaning solutions $25,000 $4,530 - - - $25,000
-
gal
- -
09 3.5311: Recover and reuse waste material $360 - - - - - $360
-
lb
-
10 3.5316: Contract a wood pallet recycling company $3,840 $42 - - - - $3,840
-
lb
-
11 4.521: Clear and rent existing space $20,300 $336 - - - - - $20,300
TOTAL RECOMMENDED $75,195 $21,723 $7,754
159,731
kWh
$15,291
-
MMBtu
$2,650
-
MMBtu
$25,000
-
gal
$4,200
-
lb
$20,300
TOTAL IMPLEMENTED $32,254 $11,903 $7,754
159,731
kWh
- - - $4,200
-
lb
$20,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs