ITAC Assessment: WV0121
ITAC logo
ITAC Assessment: WV0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Turret Steel and Structural Products
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 135,000
ft2
Annual Production 29,000
ton
Production Hrs. Annual 6,060
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,560 3,024,619
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,277 $420 $2,277
34,877
kWh
- - -
02 2.4133: Use most efficient type of electric motors $4,836 $24,738 $4,836
74,443
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $259 $160 $259
3,810
kWh
- - -
04 2.7111: Reduce illumination to minimum necessary levels $11,392 $600 $11,392
175,264
kWh
- - -
05 2.4314: Use synthetic lubricant $807 $360 $807
12,309
kWh
- - -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $23,400 - - - - $23,400
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $560 $5,000 - $(-520.0) $1,080 -
08 4.521: Clear and rent existing space $4,000 $1,600 - - $4,000 -
TOTAL RECOMMENDED $47,531 $32,878 $19,571
300,703
kWh
$(-520.0) $5,080 $23,400
TOTAL IMPLEMENTED $46,712 $27,718 $19,312
296,893
kWh
- $4,000 $23,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs