ITAC Assessment: WV0096
ITAC logo
ITAC Assessment: WV0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Tire Molds
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,155 1,849,062
kWh
Electricity Demand $92,932 5,061
kW-mo/yr
Natural Gas $17,021 3,230
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,010 $302 $1,660
47,773
kWh
$2,350
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $7,892 $4,029 $842
24,326
kWh
$7,050
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $275 $200 $275
7,913
kWh
- - - -
04 2.7241: Install outside air damper / economizer on hvac unit $538 $1,447 $538
15,240
kWh
- - - -
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,406 $490 - - $3,406
-
MMBtu
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $5,420 $8,250 $(-10.0)
(-293)
kWh
- - $(-1,900.0) $7,330
TOTAL RECOMMENDED $21,541 $14,718 $3,305
94,959
kWh
$9,400
-
kW-mo/yr
$3,406
-
MMBtu
$(-1,900.0) $7,330
TOTAL IMPLEMENTED $15,583 $5,021 $2,777
80,012
kWh
$9,400
-
kW-mo/yr
$3,406
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs