Assessment Year | 1996 |
---|---|
Principal Product | Refractories |
NAICS |
n/a
|
SIC | 3255: Clay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
160,000
ft2
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $165,137 | 4,432,884 |
kWh
|
$0.037 |
Electricity Demand | $51,249 | 11,509 |
kW-mo/yr
|
$4.45 |
Electricity Fees | $17,388 | - |
|
- |
Natural Gas | $355,381 | 101,779 |
MMBtu
|
$3.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,675 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,516 | $26,600 |
$2,516
66,823
kWh
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,819 | $1,280 |
$1,819
48,359
kWh
|
- | - | - | |
03 | 2.4314: Use synthetic lubricant | $433 | $395 |
$433
11,430
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $907 | $95 |
$907
24,033
kWh
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $1,486 | $1,467 |
$1,486
39,566
kWh
|
- | - | - | |
06 | 2.1134: Eliminate leaks in combustible gas lines | $50,374 | $5,000 | - |
$50,374
-
MMBtu
|
- | - | |
07 | 3.4114: Replace city water with recycled water via cooling tower | $4,200 | $4,980 |
$(-1,200.0)
(-31,946)
kWh
|
- |
$2,160
-
Tgal
|
$3,240
-
Tgal
|
|
TOTAL RECOMMENDED | $61,735 | $39,817 |
$5,961
158,265
kWh
|
$50,374
-
MMBtu
|
$2,160
-
Tgal
|
$3,240
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,675 | $28,370 |
$5,675
150,645
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs