| Assessment Year | 1996 |
|---|---|
| Principal Product | Automobile windshields |
| NAICS |
n/a
|
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $50 M to 100M |
| # of Employees | 230 |
| Plant Area |
240,000
ft2
|
| Annual Production | 846,000
pieces
|
| Production Hrs. Annual | 5,640
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $705,432 | 37,154,455 |
kWh
|
$0.019 |
| Electricity Demand | $324,270 | 76,436 |
kW-mo/yr
|
$4.24 |
| Electricity Fees | $213,205 | - |
|
- |
| Natural Gas | $347,294 | 89,122 |
MMBtu
|
$3.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,365 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $3,997 | $1,030 |
$3,997
158,851
kWh
|
- | - | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $438 | $11,920 |
$438
17,292
kWh
|
- | - | - | - | |
| 03 | 2.2628: Utilize a less expensive cooling method | $19,407 | $65,000 |
$19,407
277,257
kWh
|
- | - | - | - | |
| 04 | 2.2511: Insulate bare equipment | $106 | $8 | - |
$106
-
MMBtu
|
- | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,721 | $5,000 | - |
$3,721
-
MMBtu
|
- | - | - | |
| 06 | 2.1213: Direct warmest air to combustion intake | $13,672 | $3,560 | - |
$13,672
-
MMBtu
|
- | - | - | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,228 | - | - | - | - |
$5,228
-
lb
|
- | |
| 08 | 3.4151: Minimize water usage | $9,875 | $1,532 |
$(-1,061.0)
(-42,204)
kWh
|
- |
$11,820
-
Tgal
|
- | $(-884.0) | |
| TOTAL RECOMMENDED | $56,444 | $88,050 |
$22,781
411,196
kWh
|
$17,499
-
MMBtu
|
$11,820
-
Tgal
|
$5,228
-
lb
|
$(-884.0) | ||
| TOTAL IMPLEMENTED | $23,365 | $19,490 |
$3,374
133,939
kWh
|
$3,827
-
MMBtu
|
$11,820
-
Tgal
|
$5,228
-
lb
|
$(-884.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs