ITAC Assessment: WV0074
ITAC logo
ITAC Assessment: WV0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ball Mills & Blenders
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 40,000
ft2
Annual Production 1,000
ton
Production Hrs. Annual 3,060
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,329 224,502
kWh
Natural Gas $10,589 1,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,678 $3,780 $1,678
38,687
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $254 $390 $254
5,862
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $186 $500 - $186
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $1,929 $2,000 - $1,929
-
MMBtu
05 2.7491: Insulate glazing, walls, ceilings, and roofs $360 $689 - $360
-
MMBtu
TOTAL RECOMMENDED $4,407 $7,359 $1,932
44,549
kWh
$2,475
-
MMBtu
TOTAL IMPLEMENTED $2,118 $4,670 $1,932
44,549
kWh
$186
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs