ITAC Assessment: WV0063
ITAC logo
ITAC Assessment: WV0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Glass and Vinyl windows
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 310
Plant Area 93,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,896 2,462,778
kWh
Natural Gas $20,197 2,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,509 $2,400 $3,509
82,063
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $778 $360 - $778
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,308 $15 $3,308
77,374
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,103 - $1,103
25,791
kWh
-
TOTAL RECOMMENDED $8,698 $2,775 $7,920
185,228
kWh
$778
-
MMBtu
TOTAL IMPLEMENTED $4,612 $2,400 $4,612
107,854
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs