ITAC Assessment: WV0041
ITAC logo
ITAC Assessment: WV0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Copper and brass tubes
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,051 7,140,094
kWh
Natural Gas $263,328 68,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,160 $584 $5,160
185,229
kWh
-
02 2.2511: Insulate bare equipment $5,373 $1,250 - $5,373
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $423 $500 - $423
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $6,040 $3,440 - $6,040
-
MMBtu
05 2.2511: Insulate bare equipment $4,969 $2,202 - $4,969
-
MMBtu
06 2.2511: Insulate bare equipment $504 $718 $504
18,171
kWh
-
07 2.2511: Insulate bare equipment $1,566 $1,112 - $1,566
-
MMBtu
TOTAL RECOMMENDED $24,035 $9,806 $5,664
203,400
kWh
$18,371
-
MMBtu
TOTAL IMPLEMENTED $5,160 $584 $5,160
185,229
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs