ITAC Assessment: WV0032
ITAC logo
ITAC Assessment: WV0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automotive metal stampings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 485
Plant Area 977,000
ft2
Annual Production 96,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $890,138 24,318,875
kWh
Natural Gas $180,814 54,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $42 $331 $42
1,172
kWh
02 2.4133: Use most efficient type of electric motors $701 $42,700 $701
21,395
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,462 $4,000 $8,462
259,965
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,486 - $16,486
506,448
kWh
05 2.7134: Use photocell controls $8,983 $9,600 $8,983
276,084
kWh
06 2.7241: Install outside air damper / economizer on hvac unit $7,813 $1,267 $7,813
240,035
kWh
07 2.4314: Use synthetic lubricant $4,652 - $4,652
143,025
kWh
TOTAL RECOMMENDED $47,139 $57,898 $47,139
1,448,124
kWh
TOTAL IMPLEMENTED $4,694 $331 $4,694
144,197
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs