Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aliminum Extrusion
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 65,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,826 2,495,489
kWh
Electricity Demand $82,673 6,972
kW-mo/yr
Natural Gas $58,652 13,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $58,217 $20,000 $44,554
403,200
kWh
$13,663
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,529 $11,275 $15,256
138,062
kWh
$3,273
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,447 $14,000 $7,777
70,384
kWh
$1,670
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $7,406 - $6,097
55,200
kWh
$1,309
-
kW-mo/yr
- -
05 4.652: Replace existing equipment with more suitable substitutes $5,962 $1,350 $934
8,452
kWh
$5,028
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,860 $160 $4,001
36,210
kWh
$859
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $3,882 $15,000 - - $3,882
-
MMBtu
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,800 $5,000 - - - $2,800
TOTAL RECOMMENDED $111,103 $66,785 $78,619
711,508
kWh
$25,802
-
kW-mo/yr
$3,882
-
MMBtu
$2,800
TOTAL IMPLEMENTED $4,860 $160 $4,001
36,210
kWh
$859
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs