| Assessment Year | 1993 |
|---|---|
| Principal Product | Aluminum Rolled Products |
| NAICS |
n/a
|
| SIC | 3313: Electrometallurgical Products, Except Steel |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
277,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $924,750 | 23,034,877 |
kWh
|
$0.040 |
| Natural Gas | $349,438 | 79,390 |
MMBtu
|
$4.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $110,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $62,127 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,345 | $2,613 | - |
$2,345
-
MMBtu
|
|
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $18,346 | $6,950 | - |
$18,346
-
MMBtu
|
|
| 03 | 2.7124: Make a practice of turning off lights when not needed | $5,265 | $4,110 |
$5,265
257,327
kWh
|
- | |
| 04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $27,112 | $1,450 | - |
$27,112
-
MMBtu
|
|
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $51,421 | $28,120 |
$51,421
-
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $551 | $247 | - |
$551
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,643 | $3,362 |
$1,643
75,909
kWh
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $3,798 | $12,730 |
$3,798
175,264
kWh
|
- | |
| TOTAL RECOMMENDED | $110,481 | $59,582 |
$62,127
508,500
kWh
|
$48,354
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $62,127 | $48,322 |
$62,127
508,500
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs