ITAC Assessment: WM0210
ITAC logo
ITAC Assessment: WM0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Food Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 117,000
ft2
Annual Production 55,710
ton
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,358 6,499,543
kWh
Electricity Demand $159,609 10,415
kW-mo/yr
Electricity Fees $54,909 -
Natural Gas $964,080 309,938
MMBtu
LPG $22,371 1,178
MMBtu
Waste Disposal Costs
Water Usage $1,446 185
Tgal
TOTAL YEARLY COSTS $1,598,773
RECOMMENDED SAVINGS* $33,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $12,043 $21,250 - $12,043
-
kW-mo/yr
-
02 2.7221: Lower temperature during the winter season and vice-versa $8,116 - $3,670
60,179
kWh
- $4,446
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,452 - $4,007
65,692
kWh
$444
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,808 $1,400 $2,087
34,218
kWh
$720
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,410 $7,096 $1,792
29,371
kWh
$618
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $2,041 $278 $1,612
26,434
kWh
$428
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $566 $1,050 $421
6,900
kWh
$145
-
kW-mo/yr
-
08 2.1131: Repair faulty insulation in furnaces, boilers, etc $564 $1,417 - - $564
-
MMBtu
09 2.7221: Lower temperature during the winter season and vice-versa $277 - - - $277
-
MMBtu
TOTAL RECOMMENDED $33,276 $32,491 $13,590
222,794
kWh
$14,400
-
kW-mo/yr
$5,287
-
MMBtu
TOTAL IMPLEMENTED $5,218 $8,496 $3,879
63,589
kWh
$1,339
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings