| Assessment Year | 2024 |
|---|---|
| Principal Product | Plastic manufacturer |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 74 |
| Plant Area |
55,000
ft2
|
| Annual Production | 348,333,628
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $554,859 | 9,381,600 |
kWh
|
$0.059 | |
| Electricity Demand | $139,202 | 15,448 |
kW-mo/yr
|
$9.01 | |
| Electricity Fees | $272,823 | - |
|
- | |
| Natural Gas | $27,722 | 3,325 |
MMBtu
|
$8.34 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,436 | 199 |
Tgal
|
$12.24 | |
| TOTAL YEARLY COSTS | $997,042 | ||||
| RECOMMENDED SAVINGS* | $26,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $21,374 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.821: Pay bills on time to avoid late fees | $9,737 | - | - | - | $9,737 | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $7,576 | $1,700 |
$2,746
46,538
kWh
|
$4,830
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,061 | $3,250 |
$3,358
56,921
kWh
|
$703
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,372 | - |
$3,615
61,265
kWh
|
$757
-
kW-mo/yr
|
- | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,224 | - |
$999
16,932
kWh
|
$225
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $26,970 | $4,950 |
$10,718
181,656
kWh
|
$6,515
-
kW-mo/yr
|
$9,737 | ||
| TOTAL IMPLEMENTED | $21,374 | $4,950 |
$6,104
103,459
kWh
|
$5,533
-
kW-mo/yr
|
$9,737 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs