ITAC Assessment: SF0397
ITAC logo
ITAC Assessment: SF0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product wire and cable
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 136,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $780,230 8,412,643
kWh
Electricity Demand $102,866 15,660
kW-mo/yr
Electricity Fees $40,918 -
Natural Gas $80,771 10,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $12,161 - $750
8,086
kWh
- $11,411
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,394 - $7,394
79,763
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,482 $1,759 $2,482
26,773
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,301 $9,456 $11,062
119,334
kWh
$1,239
-
kW-mo/yr
-
05 2.7132: Install timers on light switches in little used areas $2,066 $2,420 $1,858
20,040
kWh
$208
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,920 $6,639 $3,920
42,291
kWh
- -
07 2.4133: Use most efficient type of electric motors $3,428 $6,271 $3,428
31,224
kWh
- -
08 2.7135: Install occupancy sensors $3,294 $7,163 $2,410
26,000
kWh
$884
-
kW-mo/yr
-
09 2.6218: Turn off equipment when not in use $19,656 $79,881 $19,656
212,037
kWh
- -
10 2.4131: Size electric motors for peak operating efficiency $28,839 $152,713 $28,839
311,108
kWh
- -
TOTAL RECOMMENDED $95,541 $266,302 $81,799
876,656
kWh
$2,331
-
kW-mo/yr
$11,411
-
MMBtu
TOTAL IMPLEMENTED $47,999 $95,735 $35,496
377,150
kWh
$1,092
-
kW-mo/yr
$11,411
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs