Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product one quart plastic oil bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 127,000
ft2
Annual Production 136,000,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $832,464 9,073,943
kWh
Electricity Demand $274,933 20,496
kW-mo/yr
Electricity Fees $43,827 -
Natural Gas $24,093 3,714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 2.4239: Eliminate or reduce compressed air usage $4,509 - $3,488
37,766
kWh
$1,021
-
kW-mo/yr
- - -
02 2.7145: Install skylights $5,597 $10,400 $4,978
41,612
kWh
$619
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,278 $576 $2,505
27,117
kWh
$773
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $306 $160 $133
1,431
kWh
$173
-
kW-mo/yr
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $1,275 $2,572 - - $1,275
-
lb
- -
06 4.652: Replace existing equipment with more suitable substitutes $78,909 $130,043 - - - - $78,909
07 4.431: Train operators for maximum operating efficiency $22,049 $60,000 - - - $22,049 -
TOTAL RECOMMENDED $115,923 $203,751 $11,104
107,926
kWh
$2,586
-
kW-mo/yr
$1,275
-
lb
$22,049 $78,909
TOTAL IMPLEMENTED $107,048 $192,775 $3,621
39,197
kWh
$1,194
-
kW-mo/yr
$1,275
-
lb
$22,049 $78,909
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs