| Assessment Year | 2023 |
|---|---|
| Principal Product | Phenolic Resin |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
450,000
ft2
|
| Annual Production | 150,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $676,819 | 12,828,000 |
kWh
|
$0.053 | |
| Electricity Demand | $458,292 | 36,614 |
kW-mo/yr
|
$12.52 | |
| Electricity Fees | $83,534 | - |
|
- | |
| Natural Gas | $1,343,982 | 201,813 |
MMBtu
|
$6.66 | |
| Waste Disposal Costs | |||||
| Water Usage | $650,000 | 230,000 |
Tgal
|
$2.83 | |
| TOTAL YEARLY COSTS | $3,212,627 | ||||
| RECOMMENDED SAVINGS* | $42,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $20,781 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $14,553 | $24,000 |
$9,885
186,500
kWh
|
$4,669
-
kW-mo/yr
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,098 | $13,750 |
$8,896
167,850
kWh
|
$4,202
-
kW-mo/yr
|
- | - | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $6,460 | - |
$2,158
40,733
kWh
|
$798
-
kW-mo/yr
|
- |
$3,504
-
MMBtu
|
|
| 04 | 2.3132: Recharge batteries on during off-peak demand periods | $5,975 | $5,360 | - | - | $5,975 | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,708 | $2,511 |
$1,155
21,785
kWh
|
$553
-
kW-mo/yr
|
- | - | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $699 | - | - | - | - |
$699
-
MMBtu
|
|
| TOTAL RECOMMENDED | $42,493 | $45,621 |
$22,093
416,868
kWh
|
$10,222
-
kW-mo/yr
|
$5,975 |
$4,203
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,781 | $21,621 |
$10,051
189,635
kWh
|
$4,755
-
kW-mo/yr
|
$5,975 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs