Assessment Year | 2023 |
---|---|
Principal Product | Industrial Dryers and Ovens for roll-to-roll processes |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
65,000
ft2
|
Annual Production | 10
units
|
Production Hrs. Annual | 3,150
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $10,425 | 204,411 |
kWh
|
$0.051 | |
Electricity Demand | $11,528 | 1,104 |
kW-mo/yr
|
$10.44 | |
Electricity Fees | $2,629 | - |
|
- | |
Natural Gas | $14,545 | 2,258 |
MMBtu
|
$6.44 | |
Waste Disposal Costs | |||||
Water Usage | $4,413 | 110 |
Tgal
|
$40.12 | |
Water Disposal | $4,413 | 110 |
Tgal
|
$40.12 | |
TOTAL YEARLY COSTS | $47,953 | ||||
RECOMMENDED SAVINGS* | $7,404 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $5,734 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,818 | $3,500 |
$1,586
31,098
kWh
|
$1,232
-
kW-mo/yr
|
|
02 | 2.4314: Use synthetic lubricant | $1,264 | $2,400 |
$710
13,939
kWh
|
$554
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $1,137 | $1,079 |
$624
12,242
kWh
|
$513
-
kW-mo/yr
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $984 | $480 |
$553
10,836
kWh
|
$431
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $668 | $980 |
$374
7,340
kWh
|
$293
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $533 | - |
$300
5,874
kWh
|
$234
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $7,404 | $8,439 |
$4,147
81,329
kWh
|
$3,257
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $5,734 | $7,360 |
$3,223
63,213
kWh
|
$2,511
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs