Assessment Year | 2022 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 9 |
Plant Area |
400,000
ft2
|
Annual Production | 1
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,818 | 1,074,450 |
kWh
|
$0.058 |
Electricity Demand | $31,531 | 2,077 |
kW-mo/yr
|
$15.18 |
Natural Gas | $13,934 | 2,062 |
MMBtu
|
$6.76 |
TOTAL YEARLY COSTS | $108,283 | |||
RECOMMENDED SAVINGS* | $21,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,017 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,961 | $8,440 |
$5,452
93,996
kWh
|
$1,509
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,050 | $8,821 |
$4,314
74,378
kWh
|
$736
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $2,934 | $1,200 |
$1,783
30,741
kWh
|
$1,151
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $2,034 | - | - | - |
$2,034
-
MMBtu
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,794 | - |
$1,141
19,671
kWh
|
$653
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,216 | - |
$880
15,174
kWh
|
$336
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $821 | $735 |
$696
12,003
kWh
|
$125
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $716 | $850 |
$561
9,678
kWh
|
$155
-
kW-mo/yr
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $123 | - |
$91
1,564
kWh
|
$33
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,650 | $20,046 |
$14,917
257,205
kWh
|
$4,698
-
kW-mo/yr
|
$2,034
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,017 | $9,671 |
$5,755
99,230
kWh
|
$1,228
-
kW-mo/yr
|
$2,034
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs