Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 9
Plant Area 400,000
ft2
Annual Production 1
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,818 1,074,450
kWh
Electricity Demand $31,531 2,077
kW-mo/yr
Natural Gas $13,934 2,062
MMBtu
TOTAL YEARLY COSTS $108,283
RECOMMENDED SAVINGS* $21,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,961 $8,440 $5,452
93,996
kWh
$1,509
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,050 $8,821 $4,314
74,378
kWh
$736
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,934 $1,200 $1,783
30,741
kWh
$1,151
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $2,034 - - - $2,034
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $1,794 - $1,141
19,671
kWh
$653
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,216 - $880
15,174
kWh
$336
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $821 $735 $696
12,003
kWh
$125
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $716 $850 $561
9,678
kWh
$155
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $123 - $91
1,564
kWh
$33
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,650 $20,046 $14,917
257,205
kWh
$4,698
-
kW-mo/yr
$2,034
-
MMBtu
TOTAL IMPLEMENTED $9,017 $9,671 $5,755
99,230
kWh
$1,228
-
kW-mo/yr
$2,034
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs