ITAC Assessment: WM0156
ITAC logo
ITAC Assessment: WM0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Potable Drinking Water and Treat Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 12
Plant Area 1,082,000
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,996 4,708,194
kWh
Electricity Demand $168,753 13,471
kW-mo/yr
Electricity Fees $27,165 -
Natural Gas $38,300 7,287
MMBtu
TOTAL YEARLY COSTS $557,214
RECOMMENDED SAVINGS* $52,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $20,527 $105,000 $20,527
276,867
kWh
- -
02 2.4314: Use synthetic lubricant $11,563 $3,300 $11,563
168,554
kWh
- -
03 2.6215: Shut off air conditioning in winter heating season $9,593 - - - $9,593
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,847 $13,133 $4,215
61,448
kWh
$632
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,864 $3,527 $1,864
27,174
kWh
- -
06 2.7221: Lower temperature during the winter season and vice-versa $1,164 - $562
8,188
kWh
- $602
-
MMBtu
07 2.2426: Use waste heat from flue gases to heat space conditioning air $1,144 $4,600 - - $1,144
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,058 - $845
12,317
kWh
$213
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $554 $2,225 $493
7,176
kWh
$61
-
kW-mo/yr
-
10 2.4221: Install compressor air intakes in coolest locations $542 $1,785 $433
6,317
kWh
$109
-
kW-mo/yr
-
TOTAL RECOMMENDED $52,856 $133,570 $40,502
568,041
kWh
$1,015
-
kW-mo/yr
$11,339
-
MMBtu
TOTAL IMPLEMENTED $3,028 $3,527 $2,426
35,362
kWh
- $602
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs