ITAC Assessment: WM0152
ITAC logo
ITAC Assessment: WM0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 8
Plant Area 856,800
ft2
Annual Production 1,034,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,748 1,646,448
kWh
Electricity Demand $33,684 3,484
kW-mo/yr
Electricity Fees $4,790 -
Natural Gas $11,529 2,134
MMBtu
Waste Disposal Costs
Water Usage $3,834 324
Tgal
TOTAL YEARLY COSTS $155,585
RECOMMENDED SAVINGS* $36,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $12,116 $86,310 $12,116
196,039
kWh
- -
02 2.4314: Use synthetic lubricant $11,295 $6,800 $9,303
150,529
kWh
$1,992
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,181 $8,340 $4,266
69,035
kWh
$915
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,130 $5,580 $2,577
41,685
kWh
$553
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $2,662 $16,000 - - $2,662
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,891 $4,160 $1,078
17,450
kWh
$812
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,275 $127,190 $29,340
474,738
kWh
$4,272
-
kW-mo/yr
$2,662
-
MMBtu
TOTAL IMPLEMENTED $14,425 $12,380 $11,880
192,214
kWh
$2,545
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs