Assessment Year | 2019 |
---|---|
Principal Product | Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 8 |
Plant Area |
856,800
ft2
|
Annual Production | 1,034,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $101,748 | 1,646,448 |
kWh
|
$0.062 | |
Electricity Demand | $33,684 | 3,484 |
kW-mo/yr
|
$9.67 | |
Electricity Fees | $4,790 | - |
|
- | |
Natural Gas | $11,529 | 2,134 |
MMBtu
|
$5.40 | |
Waste Disposal Costs | |||||
Water Usage | $3,834 | 324 |
Tgal
|
$11.83 | |
TOTAL YEARLY COSTS | $155,585 | ||||
RECOMMENDED SAVINGS* | $36,275 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,425 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $12,116 | $86,310 |
$12,116
196,039
kWh
|
- | - | |
02 | 2.4314: Use synthetic lubricant | $11,295 | $6,800 |
$9,303
150,529
kWh
|
$1,992
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,181 | $8,340 |
$4,266
69,035
kWh
|
$915
-
kW-mo/yr
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,130 | $5,580 |
$2,577
41,685
kWh
|
$553
-
kW-mo/yr
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,662 | $16,000 | - | - |
$2,662
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,891 | $4,160 |
$1,078
17,450
kWh
|
$812
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,275 | $127,190 |
$29,340
474,738
kWh
|
$4,272
-
kW-mo/yr
|
$2,662
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,425 | $12,380 |
$11,880
192,214
kWh
|
$2,545
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs