Assessment Year | 2019 |
---|---|
Principal Product | Silica sand |
NAICS | 212322: Industrial Sand Mining |
SIC | 1446: Industrial Sand |
Sales Range | $1 M to 5M |
# of Employees | 114 |
Plant Area |
26,136,000
ft2
|
Annual Production | 2,700,000
units
|
Production Hrs. Annual | 8,270
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,761,791 | 54,125,402 |
kWh
|
$0.051 |
Electricity Fees | $664,157 | - |
|
- |
Natural Gas | $2,181,438 | 524,674 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | $5,607,386 | |||
RECOMMENDED SAVINGS* | $422,645 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,286 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $336,174 | $82,000 | - |
$336,174
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,481 | $34,315 |
$31,481
616,803
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,347 | $29,120 |
$25,347
496,715
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,430 | $30,453 |
$9,430
184,788
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,068 | $14,525 |
$9,068
177,698
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,375 | $11,900 |
$6,375
124,931
kWh
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $4,770 | - |
$4,770
93,484
kWh
|
- | |
TOTAL RECOMMENDED | $422,645 | $202,313 |
$86,471
1,694,419
kWh
|
$336,174
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,286 | $76,668 |
$47,286
926,522
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs