| Assessment Year | 2017 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $100 M to 500M |
| # of Employees | 232 |
| Plant Area |
6,534,000
ft2
|
| Annual Production | 70,000,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $553,695 | 10,078,025 |
kWh
|
$0.055 | |
| Electricity Demand | $304,323 | 23,467 |
kW-mo/yr
|
$12.97 | |
| Electricity Fees | $10,546 | - |
|
- | |
| Natural Gas | $519,050 | 133,393 |
MMBtu
|
$3.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $129,459 | 34,004,198 |
Tgal
|
$0.004 | |
| TOTAL YEARLY COSTS | $1,517,073 | ||||
| RECOMMENDED SAVINGS* | $107,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $86,995 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,713 | $150,000 |
$16,081
292,704
kWh
|
$31,632
-
kW-mo/yr
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,077 | $29,868 |
$9,710
176,476
kWh
|
$6,367
-
kW-mo/yr
|
|
| 03 | 2.7124: Make a practice of turning off lights when not needed | $12,320 | - |
$7,470
135,954
kWh
|
$4,850
-
kW-mo/yr
|
|
| 04 | 2.7135: Install occupancy sensors | $10,947 | $460 |
$8,805
121,112
kWh
|
$2,142
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,535 | $3,553 |
$5,176
94,218
kWh
|
$3,359
-
kW-mo/yr
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,480 | $14,400 |
$7,480
117,892
kWh
|
- | |
| 07 | 2.7134: Use photocell controls | $4,426 | $1,430 |
$3,556
49,055
kWh
|
$870
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $107,498 | $199,711 |
$58,278
987,411
kWh
|
$49,220
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $86,995 | $168,413 |
$45,012
761,880
kWh
|
$41,983
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs