ITAC Assessment: WM0111
ITAC logo
ITAC Assessment: WM0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treated Wastewater and Salable Fertilizer
NAICS 221320: Sewage Treatment Facilities
SIC 4953: Refuse Systems
Sales Range $100
M
to 500
M
# of Employees 232
Plant Area 3,000,000
ft2
Annual Production 70,000,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $564,652 9,997,843
kWh
Electricity Demand $310,076 22,936
kW-mo/yr
Electricity Fees $193,595 -
Natural Gas $5,914,140 1,579,742
MMBtu
Waste Disposal Costs
Water Usage $211,980 119,364
Tgal
TOTAL YEARLY COSTS $7,194,443
RECOMMENDED SAVINGS* $268,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $135,557 $350,000 $135,557
1,847,585
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,256 $90,000 $38,256
677,335
kWh
- -
03 2.4314: Use synthetic lubricant $30,600 $7,500 $23,028
407,723
kWh
$7,572
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,084 $45,000 $18,136
321,127
kWh
$5,948
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,424 $56,250 $17,638
312,374
kWh
$5,786
-
kW-mo/yr
-
06 2.2622: Replace existing chiller with high efficiency model $16,506 $73,860 $12,383
219,240
kWh
$2,771
-
kW-mo/yr
$1,352
TOTAL RECOMMENDED $268,427 $622,610 $244,998
3,785,384
kWh
$22,077
-
kW-mo/yr
$1,352
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs