ITAC Assessment: AM0525
ITAC logo
ITAC Assessment: AM0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Footcare and home healthcare products
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 169,400
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,082
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,000 2,371,596
kWh
Electricity Demand $42,982 7,224
kW-mo/yr
Natural Gas $11,792 1,318
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $29,000 $6,930 $29,000
341,000
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $4,170 - $4,170
49,100
kWh
- - -
03 2.7124: Make a practice of turning off lights when not needed $3,020 - $2,470
29,100
kWh
$550
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,200 $1,420 $1,030
12,140
kWh
$100
-
kW-mo/yr
$455 $615
05 2.7124: Make a practice of turning off lights when not needed $1,095 - $765
9,000
kWh
$330
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $375 $610
7,200
kWh
$220
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $260 $70 $180
2,120
kWh
$80
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $170 $200 $120
1,420
kWh
$50
-
kW-mo/yr
- -
TOTAL RECOMMENDED $40,745 $8,995 $38,345
451,080
kWh
$1,330
-
kW-mo/yr
$455 $615
TOTAL IMPLEMENTED $40,745 $8,995 $38,345
451,080
kWh
$1,330
-
kW-mo/yr
$455 $615
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs