ITAC Assessment: KU0468
ITAC logo
ITAC Assessment: KU0468
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product insulated wire, harnesses, magnetos
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 55,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,210 805,686
kWh
Electricity Demand $10,314 3,456
kW-mo/yr
Natural Gas $10,366 2,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $29,684 $15,000 - $(-1,046.0)
-
kW-mo/yr
- $(-6,000.0)
-
lb
$(-3,750.0) $40,480
02 3.4115: Recover and reuse cooling water $4,610 $8,000 $(-1,144.0)
(-19,930)
kWh
$(-358.0)
-
kW-mo/yr
$6,112
-
gal
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,860 $191 $1,502
26,377
kWh
$358
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $582 $700 $450
7,913
kWh
$132
-
kW-mo/yr
- - - -
05 2.2511: Insulate bare equipment $566 $444 $432
7,620
kWh
$134
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $526 $137 $425
7,327
kWh
$101
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $251 $360 $114
2,052
kWh
$137
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $38,079 $24,832 $1,779
31,359
kWh
$(-542.0)
-
kW-mo/yr
$6,112
-
gal
$(-6,000.0)
-
lb
$(-3,750.0) $40,480
TOTAL IMPLEMENTED $37,828 $24,472 $1,665
29,307
kWh
$(-679.0)
-
kW-mo/yr
$6,112
-
gal
$(-6,000.0)
-
lb
$(-3,750.0) $40,480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs