| Assessment Year | 2017 |
|---|---|
| Principal Product | Treat Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 14 |
| Plant Area |
435,600
ft2
|
| Annual Production | 4,740,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $302,359 | 6,142,204 |
kWh
|
$0.049 | |
| Electricity Demand | $132,900 | 12,564 |
kW-mo/yr
|
$10.58 | |
| Electricity Fees | $57,193 | - |
|
- | |
| Natural Gas | $23,844 | 4,733 |
MMBtu
|
$5.04 | |
| Waste Disposal Costs | |||||
| Water Usage | $32,037 | 11,579 |
Tgal
|
$2.77 | |
| TOTAL YEARLY COSTS | $548,333 | ||||
| RECOMMENDED SAVINGS* | $62,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $2,993 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $25,804 | $54,545 |
$19,920
405,223
kWh
|
$5,884
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,974 | - |
$4,230
86,071
kWh
|
$8,744
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,606 | $45,000 |
$9,729
197,955
kWh
|
$2,877
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.3137: Use power during off-peak periods | $6,920 | $12,100 | - | - | $6,920 | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,993 | $3,400 |
$2,756
56,068
kWh
|
- | - | - | $237 | |
| 06 | 2.7135: Install occupancy sensors | $1,053 | $555 |
$465
9,474
kWh
|
$588
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7231: Use radiant heater for spot heating | $290 | $1,315 | - | - | - |
$290
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $62,640 | $116,915 |
$37,100
754,791
kWh
|
$18,093
-
kW-mo/yr
|
$6,920 |
$290
-
MMBtu
|
$237 | ||
| TOTAL IMPLEMENTED | $2,993 | $3,400 |
$2,756
56,068
kWh
|
- | - | - | $237 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs