ITAC Assessment: WM0105
ITAC logo
ITAC Assessment: WM0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treat Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 14
Plant Area 435,600
ft2
Annual Production 4,740,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,359 6,142,204
kWh
Electricity Demand $132,900 12,564
kW-mo/yr
Electricity Fees $57,193 -
Natural Gas $23,844 4,733
MMBtu
Waste Disposal Costs
Water Usage $32,037 11,579
Tgal
TOTAL YEARLY COSTS $548,333
RECOMMENDED SAVINGS* $62,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4314: Use synthetic lubricant $25,804 $54,545 $19,920
405,223
kWh
$5,884
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,974 - $4,230
86,071
kWh
$8,744
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,606 $45,000 $9,729
197,955
kWh
$2,877
-
kW-mo/yr
- - -
04 2.3137: Use power during off-peak periods $6,920 $12,100 - - $6,920 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,993 $3,400 $2,756
56,068
kWh
- - - $237
06 2.7135: Install occupancy sensors $1,053 $555 $465
9,474
kWh
$588
-
kW-mo/yr
- - -
07 2.7231: Use radiant heater for spot heating $290 $1,315 - - - $290
-
MMBtu
-
TOTAL RECOMMENDED $62,640 $116,915 $37,100
754,791
kWh
$18,093
-
kW-mo/yr
$6,920 $290
-
MMBtu
$237
TOTAL IMPLEMENTED $2,993 $3,400 $2,756
56,068
kWh
- - - $237
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs