| Assessment Year | 1991 |
|---|---|
| Principal Product | PLASTIC GARBAGE CANS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 230 |
| Plant Area |
n/a
|
| Annual Production | 6,885,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $585,468 | 17,824,736 |
kWh
|
$0.033 |
| Natural Gas | $106,640 | 30,228 |
MMBtu
|
$3.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,308 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $32,690 | $52,000 |
$(-2,504.0)
(-76,202)
kWh
|
$35,194
-
MMBtu
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $1,436 | $1,120 |
$(-742.0)
(-22,567)
kWh
|
$2,178
-
MMBtu
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,630 | $6,000 |
$9,630
293,083
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,552 | - |
$4,532
138,042
kWh
|
- | $(-980.0) | |
| TOTAL RECOMMENDED | $47,308 | $59,120 |
$10,916
332,356
kWh
|
$37,372
-
MMBtu
|
$(-980.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs