ITAC Assessment: WM0090
ITAC logo
ITAC Assessment: WM0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Digital Printing
NAICS 323117: Books Printing
SIC 2732: Book Printing
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 360,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,841 5,999,969
kWh
Electricity Demand $192,978 15,614
kW-mo/yr
Electricity Fees $65,149 -
Natural Gas $38,652 7,329
MMBtu
Waste Disposal Costs
Water Usage $18,534 6,084,511
Tgal
TOTAL YEARLY COSTS $766,154
RECOMMENDED SAVINGS* $97,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 3.2176: Increase use of automation $76,500 $6,500 - - $76,500
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,362 $1,245 $9,348
124,399
kWh
$3,014
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $4,717 $1,245 $3,568
47,481
kWh
$1,149
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $1,988 $1,575 $1,988
27,789
kWh
- -
05 2.7134: Use photocell controls $1,577 $1,120 $959
12,768
kWh
$618
-
kW-mo/yr
-
TOTAL RECOMMENDED $97,144 $11,685 $15,863
212,437
kWh
$4,781
-
kW-mo/yr
$76,500
TOTAL IMPLEMENTED $12,362 $1,245 $9,348
124,399
kWh
$3,014
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs