ITAC Assessment: WM0087
ITAC logo
ITAC Assessment: WM0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Broom and Brushes
NAICS 339994: Broom, Brush, and Mop Manufacturing
SIC 3991: Brooms and Brushes
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 35,700
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,575 807,280
kWh
Electricity Demand $29,571 2,637
kW-mo/yr
Electricity Fees $11,695 -
Natural Gas $8,066 1,094
MMBtu
TOTAL YEARLY COSTS $100,907
RECOMMENDED SAVINGS* $17,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,712 $23,070 $6,438
101,144
kWh
$3,274
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,991 - $2,645
41,556
kWh
$1,346
-
kW-mo/yr
03 2.7135: Install occupancy sensors $3,519 $3,325 $2,330
36,608
kWh
$1,189
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $543 $190 $360
5,641
kWh
$183
-
kW-mo/yr
TOTAL RECOMMENDED $17,764 $26,585 $11,773
184,949
kWh
$5,991
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs