ITAC Assessment: WM0077
ITAC logo
ITAC Assessment: WM0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 11,000
ft2
Annual Production 29,900,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $574,326 9,450,158
kWh
Electricity Demand $212,517 17,194
kW-mo/yr
Natural Gas $7,900 910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $177,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $77,924 - - $77,924
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $70,576 $110,308 $52,580
865,238
kWh
$17,996
-
kW-mo/yr
03 2.4314: Use synthetic lubricant $25,966 $9,000 $20,305
334,174
kWh
$5,661
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $3,179 - $2,487
40,916
kWh
$692
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $152 $180 $119
1,955
kWh
$33
-
kW-mo/yr
TOTAL RECOMMENDED $177,797 $119,488 $75,490
1,242,283
kWh
$102,306
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs