Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Exterior and interior signage
NAICS 339950: Sign Manufacturing
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 88,982
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,700
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,114 973,535
kWh
Electricity Demand $50,204 3,744
kW-mo/yr
Electricity Fees $8,240 -
Natural Gas $63,424 13,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $2,192 - - - - $2,192
02 4.512: Condense operation into one building $2,174 - $1,611
22,364
kWh
$563
-
kW-mo/yr
- -
03 2.6211: Conserve energy by efficient use of vending machines $1,126 $860 $898
12,462
kWh
$228
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,763 $305 $965
13,392
kWh
$798
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,746 $6,310 $2,290
31,796
kWh
$456
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,738 $15,750 $3,083
42,803
kWh
$2,655
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $19,530 $50,000 - - $19,530
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $784 $225 $435
6,044
kWh
$349
-
kW-mo/yr
- -
09 2.7212: Install or upgrade insulation on hvac distribution systems $1,625 $1,774 $1,625
22,558
kWh
- - -
TOTAL RECOMMENDED $37,678 $75,224 $10,907
151,419
kWh
$5,049
-
kW-mo/yr
$19,530
-
MMBtu
$2,192
TOTAL IMPLEMENTED $4,583 $1,999 $3,671
50,966
kWh
$912
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs