ITAC Assessment: WM0046
ITAC logo
ITAC Assessment: WM0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 20,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,342 1,227,679
kWh
Electricity Demand $31,870 4,249
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,185

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $266 $132 $266
5,316
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $394 $320 $302
5,080
kWh
$92
-
kW-mo/yr
-
03 4.424: Improve space comfort conditioning $5,525 $595 - - $5,525
04 4.652: Replace existing equipment with more suitable substitutes $15,846 $75,000 $13,016
214,921
kWh
$2,831
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,031 $76,047 $13,584
225,317
kWh
$2,923
-
kW-mo/yr
$5,525
TOTAL IMPLEMENTED $6,185 $1,047 $568
10,396
kWh
$92
-
kW-mo/yr
$5,525
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs