ITAC Assessment: WM0036
ITAC logo
ITAC Assessment: WM0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 28,000
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 8,232
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,722 2,984,063
kWh
Electricity Demand $80,085 12,701
kW-mo/yr
Electricity Fees $14,625 -
Natural Gas $4,459 556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.7124: Make a practice of turning off lights when not needed $288 - $288
4,341
kWh
- -
02 2.7135: Install occupancy sensors $396 $200 $396
5,966
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $783 $4,255 $632
9,515
kWh
$151
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,540 $5,355 $1,540
23,176
kWh
- -
05 4.424: Improve space comfort conditioning $3,641 $595 - - $3,641
06 2.6242: Minimize operation of equipment maintained in standby condition $7,574 $780 $1,890
24,588
kWh
$5,684
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,340 $1,900 $15,340
230,916
kWh
- -
TOTAL RECOMMENDED $29,562 $13,085 $20,086
298,502
kWh
$5,835
-
kW-mo/yr
$3,641
TOTAL IMPLEMENTED $15,628 $1,900 $15,628
235,257
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs