ITAC Assessment: WM0023
ITAC logo
ITAC Assessment: WM0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Ice cream cones and pie crust
NAICS 311812: Commercial Bakeries
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 408
Plant Area 289,000
ft2
Annual Production 22
pieces
Production Hrs. Annual 6,320
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,507 6,904,697
kWh
Electricity Demand $72,033 13,673
kW-mo/yr
Natural Gas $425,152 85,102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $4,080 $5,760 - - $4,080
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,281 $1,625 $7,412
98,899
kWh
$868
-
kW-mo/yr
- - -
03 2.4314: Use synthetic lubricant $945 $1,200 $870
11,602
kWh
$75
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $283 $494 $204
2,716
kWh
$20
-
kW-mo/yr
- - $60
05 2.7135: Install occupancy sensors $1,427 $630 $1,427
19,038
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $40,135 $39,312 $40,135
535,496
kWh
- - - -
07 4.424: Improve space comfort conditioning $50,218 $27,650 - - - $50,218 -
08 4.424: Improve space comfort conditioning $27,144 $5,800 - - - - $27,144
TOTAL RECOMMENDED $132,513 $82,471 $50,048
667,751
kWh
$963
-
kW-mo/yr
$4,080
-
MMBtu
$50,218 $27,204
TOTAL IMPLEMENTED $37,135 $8,549 $9,043
120,653
kWh
$888
-
kW-mo/yr
- - $27,204
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs