Assessment Year | 2006 |
---|---|
Principal Product | Truck Trailers |
NAICS | 336212: Truck Trailer Manufacturing |
SIC | 3715: Truck Trailers |
Sales Range | $100 M to 500M |
# of Employees | 800 |
Plant Area |
660,000
ft2
|
Annual Production | 11,500
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $355,274 | 10,298,400 |
kWh
|
$0.034 |
Electricity Demand | $204,749 | 26,289 |
kW-mo/yr
|
$7.79 |
Natural Gas | $271,117 | 25,970 |
MMBtu
|
$10.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $69,304 | $182,880 |
$41,816
1,155,144
kWh
|
$27,488
-
kW-mo/yr
|
- | - | - | |
02 | 4.424: Improve space comfort conditioning | $14,000 | $3,000 | - | - | - | - | $14,000 | |
03 | 2.2437: Recover waste heat from equipment | $12,607 | $2,000 | - | - |
$12,607
-
MMBtu
|
- | - | |
04 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $7,457 | $3,000 | - | - |
$7,457
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $6,685 | $1,920 |
$2,889
79,796
kWh
|
$3,796
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,544 | - |
$3,482
96,164
kWh
|
$2,542
-
kW-mo/yr
|
- | - | $(-480.0) | |
07 | 3.8142: Distill contaminated solvents for reuse | $4,560 | $12,105 | - | - | - |
$4,560
-
gal
|
- | |
TOTAL RECOMMENDED | $120,157 | $204,905 |
$48,187
1,331,104
kWh
|
$33,826
-
kW-mo/yr
|
$20,064
-
MMBtu
|
$4,560
-
gal
|
$13,520 | ||
TOTAL IMPLEMENTED | $108,140 | $189,800 |
$48,187
1,331,104
kWh
|
$33,826
-
kW-mo/yr
|
$12,607
-
MMBtu
|
- | $13,520 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs