| Assessment Year | 2005 |
|---|---|
| Principal Product | Printed Media |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
125,000
ft2
|
| Annual Production | 1,600
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $104,108 | 2,754,180 |
kWh
|
$0.038 |
| Electricity Demand | $76,603 | 6,945 |
kW-mo/yr
|
$11.03 |
| Natural Gas | $9,895 | 946 |
MMBtu
|
$10.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $159,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $117,732 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.424: Improve space comfort conditioning | $105,600 | $2,700 | - | - | - | - | $105,600 | |
| 02 | 4.513: Re-arrange equipment layout to reduce labor costs | $38,400 | $1,000 | - | - | - | $38,400 | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,774 | $6,289 |
$3,807
100,710
kWh
|
$2,967
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,380 | $3,200 |
$(-291.0)
(-7,700)
kWh
|
- |
$3,671
-
MMBtu
|
- | - | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,205 | $7,840 |
$1,771
46,846
kWh
|
$1,434
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,153 | - |
$1,359
35,954
kWh
|
$794
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $159,512 | $21,029 |
$6,646
175,810
kWh
|
$5,195
-
kW-mo/yr
|
$3,671
-
MMBtu
|
$38,400 | $105,600 | ||
| TOTAL IMPLEMENTED | $117,732 | $16,829 |
$6,937
183,510
kWh
|
$5,195
-
kW-mo/yr
|
- | - | $105,600 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs