Assessment Year | 2002 |
---|---|
Principal Product | Compressors & V. Pumps |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
208,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,417 | 6,201,300 |
kWh
|
$0.026 |
Electricity Demand | $130,313 | 15,065 |
kW-mo/yr
|
$8.65 |
Electricity Fees | $47,670 | - |
|
- |
Natural Gas | $52,203 | 7,948 |
MMBtu
|
$6.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,695 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,416 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $17,872 | $18,000 |
$6,110
223,800
kWh
|
$11,762
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $6,258 | $2,100 |
$4,175
152,928
kWh
|
$2,083
-
kW-mo/yr
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $4,612 | $1,200 | - | - |
$4,612
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,687 | - |
$1,886
69,090
kWh
|
$801
-
kW-mo/yr
|
- | |
05 | 2.7314: Reduce ventilation air | $2,242 | $4,100 |
$819
29,989
kWh
|
$1,423
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $1,569 | $1,000 |
$91
3,316
kWh
|
$1,478
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $849 | $4,685 |
$588
21,546
kWh
|
$261
-
kW-mo/yr
|
- | |
08 | 2.7124: Make a practice of turning off lights when not needed | $804 | $2,000 |
$457
16,757
kWh
|
$347
-
kW-mo/yr
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $802 | $616 |
$543
19,893
kWh
|
$259
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $37,695 | $33,701 |
$14,669
537,319
kWh
|
$18,414
-
kW-mo/yr
|
$4,612
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,416 | $3,200 |
$457
16,757
kWh
|
$347
-
kW-mo/yr
|
$4,612
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs