ITAC Assessment: WI0423
ITAC logo
ITAC Assessment: WI0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Recondition Containers
NAICS
n/a
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 125,000
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,030 1,719,298
kWh
Electricity Demand $30,783 5,923
kW-mo/yr
Electricity Fees $6,826 -
Natural Gas $212,455 36,351
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 3.3132: Use reverse osmosis to concentrate material $14,059 $20,000 - - - $15,359
-
Tgal
$(-1,300.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $10,458 $500 - - $10,458
-
MMBtu
- -
03 3.3131: Use evaporation to concentrate material $9,308 $11,000 - - $(-1,022.0)
-
MMBtu
$9,000
-
Tgal
$1,330
04 2.2414: Use waste heat from hot flue gases to preheat $6,599 $12,000 - - $6,599
-
MMBtu
- -
05 2.2514: Cover open tanks $3,017 $864 - - $3,017
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,966 $5,584 $2,358
73,920
kWh
$608
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $1,365 $2,500 $960
30,091
kWh
$405
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $359 $369 $286
8,952
kWh
$73
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $48,131 $52,817 $3,604
112,963
kWh
$1,086
-
kW-mo/yr
$19,052
-
MMBtu
$24,359
-
Tgal
$30
TOTAL IMPLEMENTED $15,148 $8,953 $3,604
112,963
kWh
$1,086
-
kW-mo/yr
$10,458
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs